A virtual event run of show template is a minute-by-minute production document that tells speakers, producers, moderators, and technical operators what happens, when it happens, and who is responsible. It shows what attendees should see or hear, which operator executes each cue, what must be ready first, and what to do if a transition fails. Use the template below as a shared working sheet, then adapt its times and platform instructions to your event.
A virtual event run of show is an operational schedule shared by the people responsible for producing and presenting an online event. It connects the planned program to the actions needed to put that program on screen.
It is different from an attendee agenda. An agenda might say that a webinar includes a welcome, a presentation, a demonstration, and questions. The run of show adds the details the production team needs: who introduces the speaker, which source appears, who plays the demonstration, when the moderator opens questions, and what happens if the speaker disconnects.
That distinction matters because production instructions often contain private or technical information that does not belong in public event materials. The document may include operator names, cue status, backup actions, and internal communication notes. Asana's run-of-show template similarly treats the run of show as a time-based coordination tool with responsibilities and contingencies, rather than simply a public-facing agenda.
For a small webinar, a spreadsheet may be enough. For a larger virtual conference, the same structure can be divided into separate tabs or views for the show caller, presenters, moderators, and technical operators. The essential requirement is that everyone works from the same approved schedule.
Copy this table into a spreadsheet or shared document. Add one row for each segment or production action that needs to be called. Use local event time and state the time zone in the sheet's title or header.
| Cue ID | Scheduled time | Duration | Segment | Speaker | Audience output | Production cue | Owner | Standby / dependency | Fallback | Status |
|---|---|---|---|---|---|---|---|---|---|---|
| V01 | [time + zone] | [min] | [segment] | [name] | [what attendees see/hear] | [specific action] | [person/role] | [what must be ready] | [approved alternative] | Planned |
| V02 | [time + zone] | [min] | [segment] | [name] | [what attendees see/hear] | [specific action] | [person/role] | [what must be ready] | [approved alternative] | Planned |
| V03 | [time + zone] | [min] | [segment] | [name] | [what attendees see/hear] | [specific action] | [person/role] | [what must be ready] | [approved alternative] | Planned |
Use the columns consistently:
| Field | Example |
|---|---|
| Cue ID | V05 |
| Scheduled time | 2:25 p.m. local time |
| Duration | 10 minutes |
| Segment | Product demonstration |
| Speaker | Main presenter |
| Audience output | Presenter introduction followed by demonstration video |
| Production cue | After the presenter's introduction, switch to the tested demonstration source |
| Owner | Playback operator |
| Standby / dependency | Presenter confirms the demonstration is ready; operator confirms the correct file is loaded |
| Fallback | Display prepared screenshots and continue with the approved explanation |
| Status | Tested |
The value is in the precision. The operator knows what to prepare, the presenter knows when the handoff happens, and the show caller knows what confirmation is needed before the transition.
The following example uses a hypothetical webinar scheduled from 2:00 p.m. to 3:00 p.m. The crew begins preparation at 1:15 p.m. The preparation blocks occur before the public program and are not included in its 60-minute duration.
| Time | Duration | Segment | Audience output | Cue and owner | Fallback |
|---|---|---|---|---|---|
| 1:15 p.m. | 20 min | Crew and platform checks | Not live | Technical lead checks access, audio, slides, recording, and captions | Resolve issues before go-live or escalate the postponement decision |
| 1:35 p.m. | 15 min | Speaker rehearsal | Not live | Producer rehearses introductions, handoffs, and media playback | Use the approved alternate speaker order or media |
| 1:50 p.m. | 10 min | Final standby | Holding visual, where configured | Show caller confirms required operators are READY | Hold broadcast authorization |
| 2:00 p.m. | 5 min | Welcome | Opening visual and host | Authorized platform operator starts live output; host opens the event | Keep the approved holding visual and follow the organizer's delay message |
| 2:05 p.m. | 20 min | Main presentation | Presenter and slides | Video and slide operators follow the agreed source and deck cues | Use the backup deck or moderator-led summary |
| 2:25 p.m. | 10 min | Demonstration | Demonstration video or screen | Playback operator executes the tested media cue | Display prepared screenshots or return to the presenter |
| 2:35 p.m. | 15 min | Questions and answers | Host, speaker, selected questions | Moderator selects questions and coordinates the speaker handoff | Use prepared questions if audience input is unavailable |
| 2:50 p.m. | 8 min | Closing and next steps | Closing slide and speaker | Show caller confirms remaining time and calls the closing cue | Shorten the approved closing script |
| 2:58 p.m. | 2 min | Final thanks and sign-off | Thank-you visual | Authorized operator ends live output at the approved cue | Hold the final visual while the output state is confirmed |
| 3:00 p.m. | Variable | Post-show verification | No live audience output | Recording owner verifies the file; producer confirms event completion | Escalate a missing recording or incomplete shutdown |
The live segments add up to 60 minutes: 5 + 20 + 10 + 15 + 8 + 2. The three preparation blocks add another 45 minutes before the broadcast. Post-show verification is shown separately because its duration depends on the recording and platform workflow.
This is an editable planning example, not a tested schedule or recommended segment mix. A panel with several speakers may need longer handoffs. A training session may need more time for demonstrations or audience participation. Set the schedule around the actual content, speaker availability, and rehearsal findings.
The run of show should identify an accountable owner for each important action. It does not mean every event needs a separate person for every role. Smaller productions may combine responsibilities, provided the person carrying out a critical action is clear and has the access and time to do it.
| Role | Main responsibility in the run of show |
|---|---|
| Show caller / lead producer | Maintains the authoritative schedule, calls transitions, and coordinates approved changes |
| Platform operator | Executes platform actions for which they have the required permissions |
| Audio/video operator | Monitors and adjusts the event's audio and video output |
| Presenter | Delivers the scheduled content and responds to agreed handoff cues |
| Moderator | Manages audience questions, chat, and speaker coordination |
| Playback operator | Prepares and runs approved videos, demonstrations, or other media |
| Recording owner | Confirms recording is configured and checks the resulting file after the event |
| Accessibility owner | Monitors caption delivery and coordinates the agreed accessibility escalation |
Assigning cue ownership is not the same as calculating crew headcount. The number of people needed depends on the event's complexity, simultaneous tasks, equipment, and available personnel. For a separate staffing discussion, see How Many AV Technicians Do You Need for an Event?.
A short command vocabulary can reduce uncertainty during transitions. The following is a suggested internal convention, not a required protocol from Zoom, Microsoft, or an industry standards body.
The important distinction is between readiness and authorization. A presenter may be ready to speak, and the playback operator may have a file loaded, but neither fact automatically authorizes the broadcast transition. The show caller should confirm that the required conditions are met and then call GO.
This is especially important for platform actions. Zoom documents distinct webinar roles and permissions, including differences between hosts, co-hosts, alternative hosts, panelists, and attendees. For example, a co-host cannot start a webinar in the same way an appropriately configured alternative host can. Check the Zoom webinar role and permission guidance, then assign each platform cue to an operator whose account actually has the required permission.
A checklist can confirm that individual components work. A rehearsal checks whether the whole event sequence works together. Both are useful, but they answer different questions.
Before the event, confirm:
For Zoom webinars, the practice-session documentation describes a way for the host, alternative host, and panelists to prepare before broadcasting to attendees. Zoom also documents Webinar Backstage, a behind-the-scenes workflow that may be used before, during, and after a webinar when available and configured. Do not assume that every account or event setup includes every feature; verify it in the actual account.
For Microsoft Teams, event settings and organizational policies affect organizer permissions, presenter access, green-room behavior, and audience interaction. Use Microsoft's Teams event planning guidance and test the exact event configuration. Avoid generic cues such as 'make everyone a presenter' or 'turn on the green room' unless the organizer has confirmed that those actions are available and appropriate.
Include accessibility in the production plan rather than leaving it as an informal check. WCAG 2.2 Success Criterion 1.2.4 addresses captions for live synchronized media at Level AA. See the W3C Web Content Accessibility Guidelines. The guideline should not be treated as an automatic statement of every organization's legal obligations; applicable requirements depend on the organization and jurisdiction. For the production sheet, record the caption method, the person monitoring it, and the escalation action if caption delivery fails.
A useful rehearsal should run through the actual sequence: opening, speaker introductions, screen changes, media playback, questions, closing, and recording verification. Test likely failure points too. A successful microphone check does not prove that a speaker handoff or video cue will work smoothly during the live event.
For a broader view of crew coordination, platform planning, accessibility, and failure preparation, read Virtual Event Production: The Crew, Platform, Accessibility & Failure-Planning Framework. This run-of-show template is the practical schedule that can put that wider production plan into operation.
A fallback is useful only if the organizer has approved it and the responsible person knows how to carry it out. Add the response to the relevant cue before the event, then test it where practical.
| Problem | Immediate decision | Owner | Example next action |
|---|---|---|---|
| Speaker loses connection | Hold the current segment or move to an approved alternate | Show caller | Moderator fills the gap while speaker support attempts reconnection |
| Demonstration video fails | Switch to the approved alternative | Playback operator | Display prepared screenshots or return to the presenter |
| Captions fail | Activate the accessibility escalation plan | Accessibility owner | Attempt to restore caption delivery and follow the agreed response |
| Recording is not active | Decide whether the event should pause while recording is restored | Recording owner and producer | Restore the configured recording path or escalate the decision |
| Audience Q&A is unavailable | Continue with prepared questions | Moderator | Use the prepared question list within the scheduled discussion time |
| Event runs late | Protect essential content and the closing | Show caller | Shorten optional content only after the approved decision |
Do not write 'fix the issue' as a fallback. Record the next action, the person responsible, and who decides whether the show continues, pauses, or changes order. Also avoid promising that a secondary recording, alternate stream, or backup platform will work unless it has been configured and tested.
The document should remain useful once the broadcast starts. A few operating habits help keep it reliable:
For a simple webinar, a shared spreadsheet can provide everything the team needs. Freeze the header row, use consistent status values, and restrict editing if accidental changes would create risk. A larger production may use a dedicated project management or event-production tool, but software cannot replace clear ownership and a shared decision process.
Include scheduled time and time zone, duration, segment, speaker, audience output, production cue, owner, readiness dependency, fallback, and status. Add platform-specific fields only when the event requires them.
No. An agenda tells attendees what the program covers. A run of show tells the production team when to act, what attendees should see or hear, who executes each cue, and what to do if the plan changes.
A designated producer or show caller should coordinate the authoritative schedule and call transitions. Platform, audio/video, playback, moderation, recording, and accessibility actions can be assigned to the appropriate operators.
There is no universal arrival time. Set it according to platform access, the number of speakers, rehearsal needs, and the consequences of a technical problem. The example in this article uses a 45-minute pre-show sequence as an illustration, not a mandatory rule.
Yes. The columns work as a platform-neutral planning structure, but the actual platform cues must match the event's configuration and permissions. Test them in the account and event format you will use.
The show caller should use an agreed recovery plan. This may mean shortening optional Q&A or removing a nonessential transition while protecting essential content and the closing. Record who has authority to approve that change.
No. A spreadsheet or shared document is sufficient for many simple events. Larger productions may benefit from dedicated tools, but the schedule still needs clear cue ownership, tested instructions, and one authoritative version.
A useful virtual event run of show is more than a list of times. It connects each moment in the program to an audience-facing result, a responsible operator, a readiness check, an authorized caller, and a workable alternative. Start with the template, rehearse the sequence you intend to run, and update the schedule to reflect the decisions your team has actually tested.